My husband and I are renovating our master bathroom and thought we'd share the experience. We're tearing everything out and starting from scratch. Changing a wall, replacing the shower, installing a steam shower, new cabinets, crown molding, baseboards, trim, lights and mirror. I hope you'll join us on our adventure! In case you're not familiar with blogs (like me) I'd like to remind you to start with the bottom blog (the earliest post) and work your way up.

My Photo
Name:
Location: California, United States

Wednesday, August 3, 2011

The Demolition

Yay! It's demolition time! Although it normally takes 2 to 3 weeks to order and receive a shower kit from http://www.americanbathfactory.com/, they just happened to have the one we wanted on hand (we knew it was meant to be). We have a guest bathroom so we're just going to take EVERYTHING out of the master bathroom at one time. They say we can install the shower in a weekend so we'll see if we can do it!  Time to grab the sledgehammer and don't forget to turn off the water!


This is where our vanity and wall mirror were.  Lesson number one...when removing the large bathroom mirror, be aware that they use mirror glue which leaves that lovely black residue you see in the picture.  It will need to be scraped off the wall and the wall will need to be retextured.  Lesson number two...when taking out a vanity that covers the floor and replacing it with a vanity that has legs, there WILL be bare floor!

Missing tiles after removing original vanity
Since we didn't have extra tiles from when the floor was originally put in (lesson number three...keep extra tiles) we had to find something close in color and texture. The up side is that they really won't show once the new vanity is put in so it doesn't have to be perfect. (Whew!)

The Shower
We had to run an electrical line for the steam shower (right side, behind the framework).  We ran it up into the attic (very small space since we have a two-story house but it was manageable) and over to the electrical box.  We used a 25' pvc pipe to pass it through the really tight areas which worked great!

Well, that's about it for the demolition, stay tuned!




Labels: , , , , , , , , ,

Thursday, July 7, 2011

Decisions, Decisions, Decisions...

I'd like to take a moment and explain to you that my husband and I decided to complete our project before I blogged about it.  We took lots of pictures and wrote plenty of notes to keep it fresh in our minds, so I will be blogging as if it's happening in real time.  Now that we're down to the final details, I'm ready to tell you all about our adventure and the things that we learned along the way.

I believe one of the most important questions should be "why did we decide to remodel our bathroom?" and "why now?"  Well, besides the obvious answer "because it's old and boring", if you look in the lower left corner of our shower you can see that the tiles are pushed out.  Whether it was from mold or mildew, we wanted it out!  We also found out last year that our upstairs shower only had dry wall behind the tiles and did not have the hardibacker board to protect it from moisture (and it passed inspection?!) so it was our assumption that this one didn't have it either.  We were correct.  FYI, the silver square on the bottom is duct tape where we removed and replaced tiles to see what was really behind them (very disappointing).

Our Shower "Before" Picture
The next step was what do we want?  My husband had always wanted a steam shower so this seemed the opportune time to get one.  We cut a hole in the false wall between the shower and the sink to confirm that it was hollow since it looked like the perfect place for the steam unit (and yes, we reattached the piece of wall with duct tape).  We didn't want a bathtub in this bathroom, that's for another bathroom and another blog.